Every Weld Tested in Line.

The Erie tube mill is registered to ISO 9001 for making structural and mechanical ERW tube, and to IATF 16949, the automotive quality standard. An eddy current tester checks the weld on every foot as it leaves the welder, before the tube is sized and cut.

Weld seam Test coil 2.375 OD

What We Check.

Unless an order says otherwise, tube is made to the ASTM tolerances for the specification ordered.

  1. The Weld

    In-line eddy current testing finds weld defects while the tube is still moving. Galvanized tube gets an in-line coating over the weld seam.

  2. The Size

    Outside size, wall, corner radius, squareness and twist against A500 or A513, checked on the run.

  3. The Length

    Saw-cut ends and lengths held to the length tolerance for the spec, from 20 to 48 foot mill lengths.

Tolerances at a Glance.

The figures below are the ones on our A500 and A513 data sheets. The full tables are on A500 vs. A513 and How to Measure Tube.

CheckA500StructuralA513Mechanical
Outside size, square and rectangle±.020 to ±.030 in by largest side±.008 to ±.020 in by widest side
Outside diameter, roundPer A500±.005 to ±.009 in by OD
Wall±10% of nominal, at the center of the flat±10% of nominal (square and rectangle)
Straightness.025 in times the length in feet1/16 in in 3 ft (shapes), .030 in in 3 ft (round)
Twist in 3 ft.062 to .087 in.062 to .087 in
CornersOutside radius no more than 3 times the wallPer A513
Squareness of sides90° ±2°.006 in per inch across flats

If Something Is Wrong.

Call us before you use, scrap, return or rework anything you plan to claim. Our claims policy sets out the time limits and what we need to look into it.

Time Limits

Most claims
120 days from shipment
Rust on hot rolled or pickled dry
7 days
Rust on pickled and oiled
30 days
White rust on galvanized
60 days
Red rust on galvanized
180 days
Wet or damaged on arrival
Note it on the bill of lading and claim with the carrier

What to Send Us

  • Your company name and the bill of lading
  • The bundle tag number
  • The weight and length you are rejecting, and why
  • Where on the tube the defect is, and when you found it
  • A sample at least 4 ft long, plus photos or test results